Taiwan Centers for Disease Control Complex International Competition

コンペ結果 Japanese Flag

First Prize
Ricky Liu & Associates / Ricky Liu, R.O.C.

Second Prize
FEI & CHENG ASSOCIATES / Philip T. C. Fei, R.O.C.

Third Prize
DOMINO ARCHITECTS & ASSOCIATES / Yi-yong Yang, R.O.C.

Honorable Mention (Listed in the order of Tenderer Number)
- TAG design works, Inc/Johnny C. Lu; Kornberg Associates; Ramer Architecture; Lai & Associates; C.I. Lo Architect & Associates, U.S.A.
- Shuhei Endo; Kunio Watanabe; SHEU Architect & Associate, Japan
- Mario Cipresso (Studio Shift, Inc.); HOY Architects & Associates, R.O.C.
- Manfredi Nicoletti; Arco Architects & Designers Ltd, R.O.C.

View winning entries...

開催概要

台湾の新竹に国際水準の医療センターを建設するための実施コンペ。建設総予算は、約77億円。

カテゴリ 実施コンペ / コンペ結果
タイプ International, Project, Open, Two-Stage, Onymous
ジャンル Medical-Facility
開催地 Taiwan
登録締切日 18 August 2008 GoogleCal iCal
提出締切日 18 August 2008 (Must be Received)
応募資格 Licensed architect

Description
In order to keep up with global health trends better and to provide optimal facilities for disease control research, we aim to create a world-class architectural landmark. We are convinced that a superior custom-built structure will expedite Taiwan's enthusiastic effort in international disease control, and promote close and cooperative relationship with the international community. We warmly welcome you to join in this competition!

Jury
Xian-Min Su (Taiwan)
Steve H. S. Kuo (Taiwan)
Wen-Hsin Chang (Taiwan)
Che-Ming Chiang (Taiwan)
Kwang-Jen Hsiao (Taiwan)
Monica Kuo (Taiwan)
Andrea Leers (USA)
Sheng-Fong Lin (Taiwan)
Chin-Shin Lin (Taiwan)
Yasushi NAGASAWA (Japan)
Tay Kheng Soon (Singapore)

Prize
- The service fees shall be determined at a percentage of construction budget and paid at a rate of 9% of the total construction cost of this project. (The construction budget for this project is NTD 2,283,000,000)
- Each of the finalists: NTD 2,400,000 divided by the total number of finalists

Entry Fee
None

Entries
Stage one:
- Preliminary Design Concept Report:A3 size (297mm X 420mm), horizontal, not exceed 15 pages
- Team Profile
- etc.

Stage two:
Proposal Documents:
- Design Concept Report:A3 size (297mm X 420mm), not exceed 50 pages
- Model of the main building with a 1/200 scale
- etc.

Official Language
Both Chinese and English should be used in all designs and documents

Timetable
Jury session (stage one): 2008/08/21 ~ 2008/08/22
Deadline for material submission (stage two): 2008/11/24
Jury session (stage two): 2008/11/27 ~ 2008/11/28

Promoter
The government of the R.O.C. (Taiwan)

Official Website
http://twcdc.cpami.gov.tw/index_e.html