NEW ŽIŽKOV CENTRE

プラハに1200〜1300戸の集合住宅とその周辺を計画する。

カテゴリ 実施コンペ
タイプ International, Project, Architect, Two-Stage, Onymous
ジャンル Housing
開催地 Praha, Czech Republic
登録締切日 31 October 2018 GoogleCal iCal
提出締切日 31 October 2018 (via Online)
応募資格 Authorised architects according to the legal practice of the country they are citizens of or they are registered in

Description
The objective is an architectural proposal of a residential area called NEW ŽIŽKOV CENTRE, and its surroundings. It is a private investment by CENTRAL GROUP and is not subject to public procurement mode.
The site is 39,471 m2. Buildings can only be designed on the space of 24,803 m2 defined in the land use plan as TI (information transfer device – technical infrastructure), for which the investor has filed an appeal to change its main use to SV (general combined use).
The plot includes another SV area in immediate vicinity of existent development and a non-developable area of ZMK (urban and landscape greenery). These should be designed as public space and greenery.
The aim is to design new residential buildings of approximately 106,000 m2 of gross floor area (GFA) which roughly corresponds with the volume of existing development on the plot. The investor perceives utmost use of the GFA as optimal.
The district of Žižkov is an area of mostly middle and upper-middle segment of clientele which requires appropriate design. It is necessary to consider economic availability, where possible keep to adequately simple construction, and choose both materials and technology thoroughly.n

Jury
Ing. arch. Josef Pleskot, Founder of AP Atelier
Prof. Ing. arch. Zdeněk Fránek, Founder of Fránek Architects
Doc. Ing. arch. Petr Hlaváček, Co-head of Architekti Headhand
Mgr. Dušan Kunovský, LL.M., Founder and chairman of the board, CENTRAL GROUP
Prof. Ing. arch. Roman Koucký, Founder and head of koucky-arch.cz

Prize
On the basis of the workshop, the investor intends to commission a contract worth up to 10,000,000 CZK.
Phase 2 design expenses compensation is 300,000 CZK per team.

Entry Fee
None

Timetable
Phase 2 submission: 28 February 2019

Organizer
MOBA studio s.r.o.

Official Website